Location of bioelectricity plants in the Madrid Community based on triticale crop: a multicriteria methodology

Romero Cuadrado, Luis; Romero, M. S.; Cuadrado Ebrero, Maria Luisa y Fernandez Gonzalez, Jesus (2015). Location of bioelectricity plants in the Madrid Community based on triticale crop: a multicriteria methodology. "Mathematical Problems in Engineering", v. 2015 ; pp. 1-11. ISSN 1024-123X. https://doi.org/10.1155/2015/483151.

Descripción

Título: Location of bioelectricity plants in the Madrid Community based on triticale crop: a multicriteria methodology
Autor/es:
  • Romero Cuadrado, Luis
  • Romero, M. S.
  • Cuadrado Ebrero, Maria Luisa
  • Fernandez Gonzalez, Jesus
Tipo de Documento: Artículo
Título de Revista/Publicación: Mathematical Problems in Engineering
Fecha: 2015
Volumen: 2015
Materias:
Escuela: E.T.S.I. Telecomunicación (UPM)
Departamento: Matemática Aplicada a las Tecnologías de la Información y las Comunicaciones
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[img]
Vista Previa
PDF (Document Portable Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (2MB) | Vista Previa

Resumen

This paper presents a work whose objective is, first, to quantify the potential of the triticale biomass existing in each of the agricultural regions in the Madrid Community through a crop simulation model based on regression techniques and multiple correlation. Second, a methodology for defining which area has the best conditions for the installation of electricity plants from biomass has been described and applied. The study used a methodology based on compromise programming in a discrete multicriteria decision method (MDM) context. To make a ranking, the following criteria were taken into account: biomass potential, electric power infrastructure, road networks, protected spaces, and urban nuclei surfaces. The results indicate that, in the case of the Madrid Community, the Campiña region is the most suitable for setting up plants powered by biomass. A minimum of 17,339.9 tons of triticale will be needed to satisfy the requirements of a 2.2 MW power plant. The minimum range of action for obtaining the biomass necessary in Campiña region would be 6.6 km around the municipality of Algete, based on Geographic Information Systems. The total biomass which could be made available in considering this range in this region would be 18,430.68 t.

Más información

ID de Registro: 40741
Identificador DC: http://oa.upm.es/40741/
Identificador OAI: oai:oa.upm.es:40741
Identificador DOI: 10.1155/2015/483151
URL Oficial: http://www.hindawi.com/journals/mpe/2015/483151/
Depositado por: Memoria Investigacion
Depositado el: 04 Jun 2016 10:46
Ultima Modificación: 04 Jun 2016 10:46
  • Open Access
  • Open Access
  • Sherpa-Romeo
    Compruebe si la revista anglosajona en la que ha publicado un artículo permite también su publicación en abierto.
  • Dulcinea
    Compruebe si la revista española en la que ha publicado un artículo permite también su publicación en abierto.
  • Recolecta
  • e-ciencia
  • Observatorio I+D+i UPM
  • OpenCourseWare UPM