Diseño de una planta de regasificación en Recife

Seijás Morato, Javier (2017). Diseño de una planta de regasificación en Recife. Proyecto Fin de Carrera / Trabajo Fin de Grado, E.T.S.I. de Minas y Energía (UPM).

Description

Title: Diseño de una planta de regasificación en Recife
Author/s:
  • Seijás Morato, Javier
Contributor/s:
  • Chouciño Naya, María Ángeles
Item Type: Final Project
Degree: Grado en Ingeniería de los Recursos Energéticos, Combustibles y Explosivos
Date: July 2017
Subjects:
Faculty: E.T.S.I. de Minas y Energía (UPM)
Department: Ingeniería Geológica y Minera
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[img]
Preview
PDF - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (4MB) | Preview

Abstract

Se ha realizado un diseño de una instalación de almacenamiento y regasificación de Gas Natural Licuado (GNL) situado en el puerto de Suape, en la ciudad de Recife, en Brasil. Se describen los principales equipos que componen la planta, la cual podrá transportar una cantidad de 1.900.000 m³/h. Los descubrimientos de gas y petróleo en el Atlántico hacen que haya una visión hacia el futuro en la búsqueda de la seguridad energética. En Brasil se hace un estrecho seguimiento a la evolución energética de México y Estados Unidos, por ello, la instalación de esta planta hará que haya un incremento en la producción de gas natural en el país. El proyecto ha comprendido el diseño de los equipos principales de la planta, como los tanques, el relicuador, las bombas, o el compresor. También se ha hecho un estudio económico estimando un presupuesto aproximado y se han valorado los impactos ambientales en la construcción de esta instalación. The design of a storage and regasification plant of Liquefied Natural Gas (LNG) located in the port of Suape has been done, in the city of Recife, in Brazil. The main equipment of the plant are described. It can transport a total amount of 1.900.000 m³/h. The gas and oil discoveries in the Atlantic make a vision for the future in the pursuit of energy security. In Brazil, the evolution of the energy of Mexico and United States is closely observed, therefore, the installation of this plant would increase the production of natural gas in the country. The project has included the design of the main equipment of the plant such as tanks, recondenser, pumps, or the compressor. An economic investigation has also been carried out to allocate the estimated budget and to evaluate the environmental impacts of the construction of this plant.

More information

Item ID: 47378
DC Identifier: http://oa.upm.es/47378/
OAI Identifier: oai:oa.upm.es:47378
Deposited by: Biblioteca ETSI Minas y Energía
Deposited on: 27 Jul 2017 10:43
Last Modified: 09 Mar 2018 08:16
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM