Revit Samples. El BIM como herramienta proyectual

Uribe Davies, Juan Luis (2020). Revit Samples. El BIM como herramienta proyectual. Proyecto Fin de Carrera / Trabajo Fin de Grado, E.T.S. Arquitectura (UPM).

Description

Title: Revit Samples. El BIM como herramienta proyectual
Author/s:
  • Uribe Davies, Juan Luis
Contributor/s:
  • Colmenares Vilata, Silvia
Item Type: Final Project
Degree: Grado en Fundamentos de la Arquitectura
Date: January 2020
Subjects:
Freetext Keywords: BIM; Revit; proyecto; sample; metodología; modelo; project; sample; methodology; model
Faculty: E.T.S. Arquitectura (UPM)
Department: Proyectos Arquitectónicos
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[img]
Preview
PDF - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (17MB) | Preview

Abstract

La última década ha sido escenario del surgimiento de una nueva metodología en el mundo de la arquitectura, el BIM. Esta nueva manera de proyectar ha traído consigo promesas de eficiencia, rapidez y coordinación, pero ¿cuáles son sus verdaderas implicaciones en un proyecto? ¿Puede cambiar esta metodología la propia arquitectura y a los arquitectos? A través de Revit, un programa que trabaja con la metodología BIM, y de los modelos de muestra (samples) que existen, el presente trabajo abordará estas preguntas. Utilizando estos modelos y comparándolos con modelos producidos por usuarios, se analizan diversos aspectos que componen un proyecto de arquitectura: la representación, la gestión, el tratamiento de la información y el propio modelado. A través de estos aspectos se evaluarán las consecuencias de proyectar con un software de modelado BIM. El material de referencia para llevar a cabo este análisis está formado por los ‘modelos de muestra’ proporcionados tanto por el fabricante del software como por los usuarios. En el trabajo no se hace distinción entre el proyecto de arquitectura profesional y el académico, al no disponer de información suficiente y relevante acerca del proyecto académico. Así pues, se habla de aspectos generales, que pueden aplicarse en ambos escenarios. Los resultados obtenidos no demuestran de manera inequívoca que la arquitectura esté variando cualitativamente a consecuencia del uso de esta metodología. Sin embargo, si existen diferencias notables en lo referente al proyecto y su desarrollo con respecto a la manera de proyectar tradicional. El objetivo del presente trabajo no es tanto determinar cuantitativamente el alcance de los cambios derivados de la adopción de esta metodología, como señalar algunas de las particularidades del proceso proyectual con BIM a las que el arquitecto debe responder, ya que ha de tener en cuenta parámetros diferentes a los que normalmente estaba acostumbrado. The last decade has been the scenery for the appearance of a new methodology in architecture, BIM methodology. This state-of-the-art way of designing has brought promises of efficiency, agility and coordination. However, what are the real implications for a project? And, can this new methodology change architecture and architects? Through Revit, a program based on BIM, and through existing sample models of the program, the current paper will take on these questions. By using these models and comparing them to user-produced models, several aspects that merge into a project will be analyzed: graphical representation, management, information, modelling, etc. Within these aspects, implications of how BIM modelling affect the design processed will be evaluated. The material of reference to take on the analysis is composed of sample models, which are provided by software producers and users. The investigation is not comparing between an academic and a professional project, since it lacks the relevant information to do so. Being so, it will focus on general aspects that can be withdrawn for both situations. Obtained results cannot unequivocally prove that architecture is qualitatively evolving by the use of BIM. However, there are evidences that suggest changes in the project itself, along with changes in the design process as compared with traditional methods. The objective of the current paper is not primarily focused on quantitively determining the reach of the changes derived by the adoption of this methodology, but to single out some of the particularities of the design process through BIM that an architect must face, since now it has to account for different parameters that were not present before.

More information

Item ID: 58178
DC Identifier: http://oa.upm.es/58178/
OAI Identifier: oai:oa.upm.es:58178
Deposited by: Biblioteca ETS Arquitectura 2
Deposited on: 22 Feb 2020 06:11
Last Modified: 04 Jun 2020 07:12
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM