Target Value Design: A different way of approaching the constructive process in Spain

Álvarez Pérez, Miguel Ángel and Pellicer Armiñana, Eugenio and Soler Severino, Manuel José (2018). Target Value Design: A different way of approaching the constructive process in Spain. "Journal of Modern Project Management", v. 5 (n. 3); pp. 50-55. ISSN 2317-3963.

Description

Title: Target Value Design: A different way of approaching the constructive process in Spain
Author/s:
  • Álvarez Pérez, Miguel Ángel
  • Pellicer Armiñana, Eugenio
  • Soler Severino, Manuel José
Item Type: Article
Título de Revista/Publicación: Journal of Modern Project Management
Date: January 2018
ISSN: 2317-3963
Volume: 5
Subjects:
Freetext Keywords: Target Value Design; Target Cost; Value Stream Mapping; Integrated Project Delivery; Lean Construction
Faculty: E.T.S. Arquitectura (UPM)
Department: Otro
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[img] PDF - Users in campus UPM only - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (718kB)

Abstract

The knowledge and deepening of the Lean Construction methodology, as well as its practical application in the construction industry in Spain, can produce great benefits and the general improvement of a process that continues to be anchored in anachronistic procedures for too long. It is necessary to divulge this methodology with greater intensity, so that once known, and with its positive effects in the matter of the Triple Constraint: Cost, time and quality, proven in other countries, will be applied in a generalized way in ours. We look at this article in a technique belonging to Lean Construction: Target Value Design. Like many other techniques Lean parts from its application in Toyota, in this case of Target Cost, and was used in the 70s by Taiichi Ohno with the name of Genka Kikaku, producing very good results for the Company in the matter of productivity and profitability. As with other Toyota Production System techniques, it was later incorporated to Lean Construction as Target Value Design to bring greater Value to the customer within a fixed Cost. We will see how the Target Cost can become the center of the project and the construction of the building to reach the values ​​required by the client.

More information

Item ID: 63989
DC Identifier: http://oa.upm.es/63989/
OAI Identifier: oai:oa.upm.es:63989
Official URL: https://www.journalmodernpm.com/index.php/jmpm/article/view/JMPM01506
Deposited by: Memoria Investigacion
Deposited on: 05 Oct 2020 07:26
Last Modified: 05 Oct 2020 07:32
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM