Full text
Preview |
PDF
- Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (1MB) | Preview |
Cabellos de Francisco, Oscar Luis, Ceresio, C., Martínez, J.S. and Diez de la Obra, Carlos Javier (2011). UPM Results BWR-PWR Exercise I-1 by MCNP5 code. In: "OECD Benchmark for Uncertainty Analysis in Best-Estimate Modelling (UAM) for Design, Operation and Safety Analysis of LWRs - Fifth Workshop (UAM-5)", 01/04/2011 - 04/04/2011, Estocolmo, Suecia.
Title: | UPM Results BWR-PWR Exercise I-1 by MCNP5 code |
---|---|
Author/s: |
|
Item Type: | Presentation at Congress or Conference (Article) |
Event Title: | OECD Benchmark for Uncertainty Analysis in Best-Estimate Modelling (UAM) for Design, Operation and Safety Analysis of LWRs - Fifth Workshop (UAM-5) |
Event Dates: | 01/04/2011 - 04/04/2011 |
Event Location: | Estocolmo, Suecia |
Title of Book: | Proceedings of the OECD Benchmark for Uncertainty Analysis in Best-Estimate Modelling (UAM) for Design, Operation and Safety Analysis of LWRs - Fifth Workshop (UAM-5) |
Date: | 2011 |
Subjects: | |
Faculty: | E.T.S.I. Industriales (UPM) |
Department: | Ingeniería Nuclear [hasta 2014] |
Creative Commons Licenses: | Recognition - No derivative works - Non commercial |
Preview |
PDF
- Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (1MB) | Preview |
The perturbation approach relies in principle on a unique “NJOY + MCNP5 + SUSD3D”calculation. The inputs are the geometry MCNP5 input file and an ENDF file containing covariances.
Item ID: | 11556 |
---|---|
DC Identifier: | https://oa.upm.es/11556/ |
OAI Identifier: | oai:oa.upm.es:11556 |
Official URL: | http://www.oecd-nea.org/science/wprs/meetings/ |
Deposited by: | Memoria Investigacion |
Deposited on: | 12 Dec 2012 18:38 |
Last Modified: | 20 Apr 2016 19:35 |