Full text
Preview |
PDF
- Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (747kB) | Preview |
Pérez Díaz, Juan Ignacio and Millan, Ruben and Garcia, David and Guisandez, Ignacio and Wilhelmi Ayza, José-Román (2011). Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation. In: "The 6th Dubrovnik Conference on Sustainable Development of Energy, Water and Environment Systems", 25/09/2011 - 29/09/2011, Dubrovnik, Crocacia. pp. 1-13.
Title: | Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation |
---|---|
Author/s: |
|
Item Type: | Presentation at Congress or Conference (Article) |
Event Title: | The 6th Dubrovnik Conference on Sustainable Development of Energy, Water and Environment Systems |
Event Dates: | 25/09/2011 - 29/09/2011 |
Event Location: | Dubrovnik, Crocacia |
Title of Book: | Proceedings of The 6th Dubrovnik Conference on Sustainable Development of Energy, Water and Environment Systems |
Date: | 2011 |
Subjects: | |
Faculty: | E.T.S.I. Caminos, Canales y Puertos (UPM) |
Department: | Ingeniería Civil: Hidráulica y Energética [hasta 2014] |
Creative Commons Licenses: | Recognition - No derivative works - Non commercial |
Preview |
PDF
- Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (747kB) | Preview |
Environmental constraints imposed on hydropoweroperation are usually given in the form of minimum environmental flows and maximum and minimum rates of change of flows, or ramp rates. One solution proposed to mitigate the environmental impact caused by the flows discharged by a hydropower plant while reducing the economic impact of the above-mentioned constraints consists in building a re-regulationreservoir, or afterbay, downstream of the power plant. Adding pumpingcapability between the re-regulationreservoir and the main one could contribute both to reducing the size of the re-regulationreservoir, with the consequent environmental improvement, and to improving the economic feasibility of the project, always fulfilling the environmental constraints imposed to hydropoweroperation. The objective of this paper is studying the contribution of a re-regulationreservoir to fulfilling the environmental constraints while reducing the economic impact of said constraints. For that purpose, a revenue-driven optimization model based on mixed integer linear programming is used. Additionally, the advantages of adding pumpingcapability are analysed. In order to illustrate the applicability of the methodology, a case study based on a real hydropower plant is presented
Item ID: | 12803 |
---|---|
DC Identifier: | https://oa.upm.es/12803/ |
OAI Identifier: | oai:oa.upm.es:12803 |
Official URL: | http://www.dubrovnik2011.sdewes.org/ |
Deposited by: | Memoria Investigacion |
Deposited on: | 14 Nov 2012 09:26 |
Last Modified: | 21 Apr 2016 12:05 |