Proyecto de mejora de instalaciones de calefacción, ACS y envolvente térmica de un edificio existente

Navarro Peral, Rodrigo (2014). Proyecto de mejora de instalaciones de calefacción, ACS y envolvente térmica de un edificio existente. Proyecto Fin de Carrera / Trabajo Fin de Grado, E.T.S.I. de Minas y Energía (UPM).

Description

Title: Proyecto de mejora de instalaciones de calefacción, ACS y envolvente térmica de un edificio existente
Author/s:
  • Navarro Peral, Rodrigo
Contributor/s:
Item Type: Final Project
Date: July 2014
Subjects:
Faculty: E.T.S.I. de Minas y Energía (UPM)
Department: Otro
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[thumbnail of PFC_Rodrigo_Navarro_Peral.pdf]
Preview
PDF - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (5MB) | Preview

Abstract

En este escrito se pretende llevar a cabo la realización de un proyecto técnico sobre eficiencia energética en edificios. El proyecto comienza con el estudio de la demanda térmica de un edificio, es decir, de sus necesidades de calefacción, refrigeración y agua caliente sanitaria (ACS). Una vez realizado este análisis, se procede al estudio de distintas alternativas para la disminución del coste asociado al consumo energético del edificio, las cuales son: mejora del aislamiento de la envolvente térmica del edificio, instalación de colectores solares para la producción de ACS y el cambio de los quemadores de las calderas. De estas medidas se han presupuestado aquellas que poseen un bajo periodo de retorno de la inversión, y se ha desarrollado su planificación, programación temporal y análisis económico. ABSTRACT In this document is pretended to be carry out the performance of a technical project about energy efficiency in buildings. The project begins with the study of the thermal demand of the building, that is to say, the heating, cooling and domestic hot water (DHW) needs. Once the analysis has been done, is proceeded the study of different alternatives for diminishing the cost associate to the building energy consumption, which are: improvement of the insulation of the building, solar collector installation to produce DHW and change of the burner of the boilers. Among this measures, has been budgeted the ones that possess a low invest pay-back, and it is been developed their planning, their temporal programming and their economic analysis.

More information

Item ID: 32736
DC Identifier: https://oa.upm.es/32736/
OAI Identifier: oai:oa.upm.es:32736
Deposited by: Biblioteca ETSI Minas y Energía
Deposited on: 13 Nov 2014 09:44
Last Modified: 16 Mar 2018 12:45
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM