Escudero Restrepo, Sergio Andrés (2016). Mejora del proceso productivo de áridos Industrial Conconcreto, Medellín-Colombia. Thesis (Master thesis), E.T.S.I. de Minas y Energía (UPM).
Title: | Mejora del proceso productivo de áridos Industrial Conconcreto, Medellín-Colombia |
---|---|
Author/s: |
|
Contributor/s: |
|
Item Type: | Thesis (Master thesis) |
Masters title: | Minería Sostenible |
Date: | January 2016 |
Subjects: | |
Faculty: | E.T.S.I. de Minas y Energía (UPM) |
Department: | Ingeniería Geológica y Minera |
Creative Commons Licenses: | Recognition - No derivative works - Non commercial |
Preview |
PDF
- Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (4MB) | Preview |
La explotación que realiza Industrial Conconcreto se ha desarrollado desde hace 45 años. Los frentes de explotación actuales están llegando a su fin y se cuenta con otras áreas aledañas para dar continuidad a la empresa. Actualmente la empresa opera dos plantas de procesamiento de materiales para la producción de áridos. La distancia de una de las plantas hacia las nuevas áreas de explotación hace que los costos de transporte sean muy altos y se deba pensar en mejores soluciones. Como alternativa se plantea la eliminación de la planta más antigua y la ampliación de la otra con el objetivo de lograr producir con una sola planta al menos lo que producen las dos actualmente o incluso más, además de una reducción en los costos de operación debido a la concentración de los recursos en una sola planta. Para resolver estas inquietudes se realizó el estudio de cómo ampliar la planta, seleccionar los mejores equipos y analizar cómo afectan a los costes y volúmenes de producción de acuerdo a escenarios optimista, moderado y pesimista; obteniendo cómo resultado la viabilidad del proyecto. Industrial Conconcreto has been extracted aggregates of this mine 45 years ago. This mine is near to close, due to the absence of more aggregates. However Industrial Conconcreto has another mining area next to their operations. Nowadays the company produces aggregates in two plants. The distance between one of their plants (Plant 1) is very large. For this reason the transportation costs would increase significantly and so it is necessary to think in other ways to produce aggregates with less cost. As a solution to this problem, it is proposed to stop operations in the oldest plant and increase the capacity of the newer plant, maintaining at least the same or even increasing at production of both plants. But we should be able to reduce the cost using new technologies and joining all operations in one plant. We did this project answering this questions, as a consequence of that, we select the best equipments and we have done an analysis of productions, costs, and times through different scenarios, optimistic, moderate and pessimistic. As a result we will get to know if our project is viable.
Item ID: | 47060 |
---|---|
DC Identifier: | https://oa.upm.es/47060/ |
OAI Identifier: | oai:oa.upm.es:47060 |
Deposited by: | Biblioteca ETSI Minas y Energía |
Deposited on: | 26 Jun 2017 10:55 |
Last Modified: | 26 Jun 2017 10:55 |