Citation
Guzmán Báez, Ana de and Villoria Sáez, Paola and Río Merino, Mercedes del and García Navarro, Justo
(2012).
Methodology for quantification of waste generated in Spanish railway construction works.
"Waste Management"
(n. 32);
pp. 920-924.
ISSN 0956-053X.
https://doi.org/10.1016/j.wasman.2012.01.007.
Abstract
El objetivo de este estudio es ayudar en la mejora de la gestión de los Residuos de Construcción y Demolición (RCD) en obras lineales de ferrocarril, estimando a priori la cantidad de RCD que se van a generar teniendo en cuenta tanto la fase en la que se generan como el tipo de residuo
-----ABSTRACT-----
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47 million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project.