Central termoeléctrica en San Matías, Bolivia

Gil Ramón, Verónica (2018). Central termoeléctrica en San Matías, Bolivia. Proyecto Fin de Carrera / Trabajo Fin de Grado, E.T.S.I. de Minas y Energía (UPM).

Description

Title: Central termoeléctrica en San Matías, Bolivia
Author/s:
  • Gil Ramón, Verónica
Contributor/s:
Item Type: Final Project
Degree: Grado en Ingeniería de los Recursos Energéticos, Combustibles y Explosivos
Date: September 2018
Subjects:
Faculty: E.T.S.I. de Minas y Energía (UPM)
Department: Energía y Combustibles
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[thumbnail of PFG_Veronica_Gil_Ramon.pdf]
Preview
PDF - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (5MB) | Preview

Abstract

El “Plan eléctrico del estado plurinacional de Bolivia 2025” plantea la integración de los actuales sistemas aislados de generación eléctrica al Sistema Interconectado Nacional(SIN). En esta línea, se proyecta la interconexión eléctrica entre San Ignacio de Velasco y San Matías que implica la construcción de una central en la localidad de San Matías (Santa Cruz, Bolivia) para dar suministro al municipio y evitar el efecto Ferranti. Se ha analizado la demanda (14MW), así como las posibles alternativas de generación y se concluye que la mejor opción es la construcción de una central térmica impulsada por seis grupos electrógenos de 2,5 MW. Por último se ha hecho un dimensionamiento de los equipos principales y se ha calculado la rentabilidad del proyecto.ABSTRACTThe "Electric Plan of the Plurinational State of Bolivia 2025" proposes the integration ofcurrent isolated electrical systems into the National Interconnected System (SIN). In thisline, the electrical interconnection between San Ignacio de Velasco and San Matías wasprojected, which implies the construction of a power plant in San Matías (Santa Cruz,Bolivia) to supply the municipality and avoid Ferranti’s effect. The demand (14MW) hasbeen analyzed, as well as the possible alternatives for generation and it is concluded thatthe best option is the construction of a thermoelectric power plant driven by six 2,5 MWgenerating sets. Finally, a sizing of the main equipment and the profitability of the projecthas been calculated.

More information

Item ID: 52893
DC Identifier: https://oa.upm.es/52893/
OAI Identifier: oai:oa.upm.es:52893
Deposited by: Biblioteca ETSI Minas y Energía
Deposited on: 31 Oct 2018 12:20
Last Modified: 05 Nov 2018 07:54
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM