@inproceedings{upm19328, month = {July}, title = {Bridges E-2 and E-3 in the new railway to the Northwest of Spain}, year = {2011}, pages = {405--406}, booktitle = {Proceedings of 5th International Conference on Bridge Maintenace, Safety and Management IABMAS}, author = {Jurado Caba{\~n}es, Carlos}, abstract = {During the years 2001 to 2007 it has been constructed in Spain the new railway line of high speed (L. H. S.)that connects Madrid with Valladolid with a length of 179.6 kilometres.}, url = {https://oa.upm.es/19328/}, isbn = {9780415877862} }