%0 Conference Paper %A Jurado CabaƱes, Carlos %B 5th International Conference on Bridge Maintenace, Safety and Management IABMAS %C Philadelphia (USA) %D 2011 %F upm:19328 %P 405-406 %T Bridges E-2 and E-3 in the new railway to the Northwest of Spain %U https://oa.upm.es/19328/ %X During the years 2001 to 2007 it has been constructed in Spain the new railway line of high speed (L. H. S.)that connects Madrid with Valladolid with a length of 179.6 kilometres.