Study of a cost model of tidal energy farms in early design phases with parametrization and numerical values. Application to a second-generation device

López Piñeiro, Amable ORCID: https://orcid.org/0000-0001-7324-3247, Morán González, José Luis ORCID: https://orcid.org/0000-0003-2633-1265, Núñez Rivas, Luis Ramón ORCID: https://orcid.org/0000-0002-5900-0684 and Somolinos Sánchez, José Andrés ORCID: https://orcid.org/0000-0002-7237-9182 (2020). Study of a cost model of tidal energy farms in early design phases with parametrization and numerical values. Application to a second-generation device. "Renewable and Sustainable Energy Reviews", v. 2020 (n. 117); pp. 1-15. ISSN 1364-0321. https://doi.org/10.1016/j.rser.2019.109497.

Descripción

Título: Study of a cost model of tidal energy farms in early design phases with parametrization and numerical values. Application to a second-generation device
Autor/es:
Tipo de Documento: Artículo
Título de Revista/Publicación: Renewable and Sustainable Energy Reviews
Fecha: Enero 2020
ISSN: 1364-0321
Volumen: 2020
Número: 117
Materias:
Palabras Clave Informales: Marine renewable energy; Levelized cost of energy: Tidal energy; Ocean energy; Cost model; Cost tool
Escuela: E.T.S.I. Navales (UPM)
Departamento: Arquitectura, Construcción y Sistemas Oceánicos y Navales (Dacson)
Grupo Investigación UPM: Investigación Tecnológico en Energías Renovables Marinas GIT-ERM
Licencias Creative Commons: Ninguna

Texto completo

[thumbnail of 01_pagination_RSER_109497.pdf] PDF (Portable Document Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (4MB)

Resumen

Tidal Energy Conversion farms are a promising but not yet mature technology whose costs are still highly uncertain. In order to be able to predict costs for early Technology Readiness Level (TRL) phases, this paper presents a cost model in which a detailed parametrization of all Capital Expenditures and Operation and Maintenance items has been carried out, whose results make it possible to select the best design alternative in each case. Each parameter has been updated with numerical values based on both actual and foreseen costs. A generalist tool that integrates all these parameters and that calculates, among other variables, the Levelized Cost of Energy (LCOE) has also been developed. This tool, in which the parameters have been updated, has been applied as a case study to a single-rotor GESMEY-designed generator in the case of both fixed and controllable pitch; the numerical results for the operation parameters selected are also included. The model presented in this paper is proposed in order to compare different design alternatives, under user-defined operation conditions, for tidal energy projects in early TRL phases and the effect on their LCOE.

Proyectos asociados

Tipo
Código
Acrónimo
Responsable
Título
Gobierno de España
DPI2014-53499-R
Sin especificar
Sin especificar
Sin especificar

Más información

ID de Registro: 92340
Identificador DC: https://oa.upm.es/92340/
Identificador OAI: oai:oa.upm.es:92340
URL Portal Científico: https://portalcientifico.upm.es/es/ipublic/item/6012515
Identificador DOI: 10.1016/j.rser.2019.109497
URL Oficial: https://www.sciencedirect.com/science/article/pii/...
Depositado por: José A Somolinos
Depositado el: 12 Ene 2026 17:59
Ultima Modificación: 12 Ene 2026 17:59