Texto completo
|
PDF (Portable Document Format)
- Acceso permitido solamente al administrador del Archivo Digital UPM
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (11MB) |
ORCID: https://orcid.org/0000-0002-2626-9361, González García, María de las Nieves
ORCID: https://orcid.org/0000-0002-0299-0840, Baptista, João Santos
ORCID: https://orcid.org/0000-0002-8524-5503 and Rodrigues, Fernanda
ORCID: https://orcid.org/0000-0001-9127-7766
(2023).
Geometric interpretation of risk and prevention, by implementation of the “Level of preventive action” risk assessment method.
"Safety science"
(n. 167);
p. 106259.
ISSN 0925-7535.
https://doi.org/10.1016/j.ssci.2023.106259.
| Título: | Geometric interpretation of risk and prevention, by implementation of the “Level of preventive action” risk assessment method |
|---|---|
| Autor/es: |
|
| Tipo de Documento: | Artículo |
| Título de Revista/Publicación: | Safety science |
| Fecha: | 1 Noviembre 2023 |
| ISSN: | 0925-7535 |
| Número: | 167 |
| Materias: | |
| ODS: | |
| Palabras Clave Informales: | Construcción ; Seguridad en el trabajo ; Evaluación de riesgos en el trabajo ; BIM |
| Escuela: | E.T.S. de Edificación (UPM) |
| Departamento: | Construcciones Arquitectónicas y su Control |
| Licencias Creative Commons: | Ninguna |
|
PDF (Portable Document Format)
- Acceso permitido solamente al administrador del Archivo Digital UPM
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (11MB) |
Risk assessment methodologies are determining tools in risk prevention for construction works. However, frequently the evaluation is presented in a linguistic context and may involve interpretation difficulties in multicultural contexts. This research aims to visually show the evaluation, in a geometric context, the risk conditions and the necessary prevention level. The methodology arises from the theoretical-practical model of occupational risk assessment, adapted to construction works called “Level of Preventive Action”. It is based on the preventive environments’ observation: initial, documentary, constructive, and social environments (through technical observation and psychosocial survey). Implementing and developing this new methodology by resourcing a digital tool is essential for integrating BIM approach procedures. The Level of Preventive Action procedures shows the existing risk in the different preventive environments, from its so-called Characteristic Value and its interaction with the assessed risk (in the scope of Safety at Work, Industrial Hygiene, Ergonomics and Psychosociology). Finally, the existing risks and the level of preventive actions required according to the workers’ behaviors and emotional states are shown. The Level of Preventive Action geometric interpretation is qualitative, quantitative, visual, and dynamic. It allows interaction with the worker in real-time, with electronic devices, joining technology to human behavior.
| ID de Registro: | 93311 |
|---|---|
| Identificador DC: | https://oa.upm.es/93311/ |
| Identificador OAI: | oai:oa.upm.es:93311 |
| URL Portal Científico: | https://portalcientifico.upm.es/es/ipublic/item/10091050 |
| Identificador DOI: | 10.1016/j.ssci.2023.106259 |
| URL Oficial: | https://www.sciencedirect.com/science/article/pii/... |
| Depositado por: | iMarina Portal Científico |
| Depositado el: | 23 Ene 2026 19:29 |
| Ultima Modificación: | 24 Ene 2026 07:41 |
Publicar en el Archivo Digital desde el Portal Científico