Large Scale Fire Tests for the “Calle 30 Project"

Fernández Martín, Sonia; Rey Llorente, Ignacio del; Grande Pérez, Alfredo; Espinosa Antelo, Irene y Alarcón Álvarez, Enrique (2012). Large Scale Fire Tests for the “Calle 30 Project". En: "5th. International Symposium on Tunnel Safety and Security", 14/03/2012-16/03/2012, New York. ISBN 978-91-87017-26-1.

Descripción

Título: Large Scale Fire Tests for the “Calle 30 Project"
Autor/es:
  • Fernández Martín, Sonia
  • Rey Llorente, Ignacio del
  • Grande Pérez, Alfredo
  • Espinosa Antelo, Irene
  • Alarcón Álvarez, Enrique
Tipo de Documento: Ponencia en Congreso o Jornada (Artículo)
Título del Evento: 5th. International Symposium on Tunnel Safety and Security
Fechas del Evento: 14/03/2012-16/03/2012
Lugar del Evento: New York
Título del Libro: Proceedings from the Fifth International Symposium on Tunnel Safety and Security
Fecha: 2012
ISBN: 978-91-87017-26-1
Volumen: 2
Materias:
Palabras Clave Informales: Tunnel - Fire - Temperature - Ventilation - Visibility - Water mist
Escuela: E.T.S.I. Industriales (UPM)
Departamento: Mecánica Estructural y Construcciones Industriales [hasta 2014]
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[img] PDF (Document Portable Format) - Acceso permitido solamente a usuarios en el campus de la UPM - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (1MB)

Resumen

Between 2003 and 2007 an urban network of road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as “Calle30 Project” counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure including,in some parts of the tunnel, fixed fire fighting system based on water mist. Within this framework a large-scale campaign of fire tests were planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinction system. In addition, this large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San Pedro of Anes" which counts with a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test’s campaign carried out and some previous results obtained.

Más información

ID de Registro: 32381
Identificador DC: http://oa.upm.es/32381/
Identificador OAI: oai:oa.upm.es:32381
URL Oficial: http://www.istss.se/en/symposium/istss2012/Sidor/default.aspx
Depositado por: Biblioteca ETSI Industriales
Depositado el: 18 Oct 2014 22:25
Ultima Modificación: 18 Oct 2014 22:25
  • Open Access
  • Open Access
  • Sherpa-Romeo
    Compruebe si la revista anglosajona en la que ha publicado un artículo permite también su publicación en abierto.
  • Dulcinea
    Compruebe si la revista española en la que ha publicado un artículo permite también su publicación en abierto.
  • Recolecta
  • e-ciencia
  • Observatorio I+D+i UPM
  • OpenCourseWare UPM