MILP for the inventory and routing problem for replenishment the car assembly line.

Pulido Martínez, Raúl; García Sánchez, Álvaro; Ortega Mier, Miguel Ángel y Brun, Alessandro (2014). MILP for the inventory and routing problem for replenishment the car assembly line.. "International Journal of Production Management and Engineering", v. 2 (n. 1); pp. 37-45. ISSN 2340-5317. https://doi.org/10.4995/ijpme.2014.1838.

Descripción

Título: MILP for the inventory and routing problem for replenishment the car assembly line.
Autor/es:
  • Pulido Martínez, Raúl
  • García Sánchez, Álvaro
  • Ortega Mier, Miguel Ángel
  • Brun, Alessandro
Tipo de Documento: Artículo
Título de Revista/Publicación: International Journal of Production Management and Engineering
Fecha: 2014
Volumen: 2
Materias:
Palabras Clave Informales: Integer Programming, Routing, Inventory, Assembly line.
Escuela: E.T.S.I. Industriales (UPM)
Departamento: Ingeniería de Organización, Administración de Empresas y Estadística
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[img]
Vista Previa
PDF (Document Portable Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (2MB) | Vista Previa

Resumen

The inbound logistic for feeding the workstation inside the factory represents a critical issue in the car manufacturing industry. Nowadays, this issue is even more critical than in the past since more types of car are being produced in the assembly lines. Consequently, as workstations have to install many types of components, they also need to have an inventory of different types of the component in a compact space. The replenishment is a critical issue since a lack of inventory could cause line stoppage or reworking. On the other hand, an excess of inventory could increase the holding cost or even block the replenishment paths. The decision of the replenishment routes cannot be made without taking into consideration the inventory needed by each station during the production time which will depend on the production sequence. This problem deals with medium-sized instances and it is solved using online solvers. The contribution of this paper is a MILP for the replenishment and inventory of the components in a car assembly line.

Más información

ID de Registro: 37983
Identificador DC: http://oa.upm.es/37983/
Identificador OAI: oai:oa.upm.es:37983
Identificador DOI: 10.4995/ijpme.2014.1838
URL Oficial: http://ojs.upv.es/index.php/IJPME/article/view/1838/2204
Depositado por: Memoria Investigacion
Depositado el: 07 Oct 2015 15:03
Ultima Modificación: 21 Mar 2017 16:01
  • Open Access
  • Open Access
  • Sherpa-Romeo
    Compruebe si la revista anglosajona en la que ha publicado un artículo permite también su publicación en abierto.
  • Dulcinea
    Compruebe si la revista española en la que ha publicado un artículo permite también su publicación en abierto.
  • Recolecta
  • e-ciencia
  • Observatorio I+D+i UPM
  • OpenCourseWare UPM