Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant

Chazarra, Manuel; Pérez Díaz, Juan Ignacio; García González, Javier y Helseth, Arild (2016). Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant. "Energy Procedia", v. 87 ; pp. 53-60. ISSN 1876-6102. https://doi.org/10.1016/j.egypro.2015.12.357.

Descripción

Título: Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant
Autor/es:
  • Chazarra, Manuel
  • Pérez Díaz, Juan Ignacio
  • García González, Javier
  • Helseth, Arild
Tipo de Documento: Artículo
Título de Revista/Publicación: Energy Procedia
Fecha: Enero 2016
Volumen: 87
Materias:
Palabras Clave Informales: Pumped-Storage Plant; Secondary Regulation Reserve Market; Real-Time Use of Reserves
Escuela: E.T.S.I. Caminos, Canales y Puertos (UPM)
Departamento: Ingeniería Civil: Hidráulica, Energía y Medio Ambiente
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[img]
Vista Previa
PDF (Document Portable Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (550kB) | Vista Previa

Resumen

This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.

Proyectos asociados

TipoCódigoAcrónimoResponsableTítulo
Gobierno de EspañaENE2012-32207Sin especificarSin especificarExplotación y Control de Centrales hidroeléctricas Reversibles

Más información

ID de Registro: 42193
Identificador DC: http://oa.upm.es/42193/
Identificador OAI: oai:oa.upm.es:42193
Identificador DOI: 10.1016/j.egypro.2015.12.357
URL Oficial: http://www.sciencedirect.com/science/article/pii/S1876610215030465
Depositado por: Memoria Investigacion
Depositado el: 27 Jun 2016 15:40
Ultima Modificación: 27 Jun 2016 15:40
  • Open Access
  • Open Access
  • Sherpa-Romeo
    Compruebe si la revista anglosajona en la que ha publicado un artículo permite también su publicación en abierto.
  • Dulcinea
    Compruebe si la revista española en la que ha publicado un artículo permite también su publicación en abierto.
  • Recolecta
  • e-ciencia
  • Observatorio I+D+i UPM
  • OpenCourseWare UPM