Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant

Chazarra Jover, Manuel Joaquín and Pérez Díaz, Juan Ignacio and García González, Javier and Helseth, Arild (2016). Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant. "Energy Procedia", v. 87 ; pp. 53-60. ISSN 1876-6102. https://doi.org/10.1016/j.egypro.2015.12.357.

Description

Title: Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant
Author/s:
  • Chazarra Jover, Manuel Joaquín
  • Pérez Díaz, Juan Ignacio
  • García González, Javier
  • Helseth, Arild
Item Type: Article
Título de Revista/Publicación: Energy Procedia
Date: January 2016
ISSN: 1876-6102
Volume: 87
Subjects:
Freetext Keywords: Pumped-Storage Plant; Secondary Regulation Reserve Market; Real-Time Use of Reserves
Faculty: E.T.S.I. Caminos, Canales y Puertos (UPM)
Department: Ingeniería Civil: Hidráulica, Energía y Medio Ambiente
Creative Commons Licenses: Recognition - No derivative works - Non commercial

Full text

[img]
Preview
PDF - Requires a PDF viewer, such as GSview, Xpdf or Adobe Acrobat Reader
Download (550kB) | Preview

Abstract

This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.

Funding Projects

TypeCodeAcronymLeaderTitle
Government of SpainENE2012-32207UnspecifiedUnspecifiedExplotación y Control de Centrales hidroeléctricas Reversibles

More information

Item ID: 42193
DC Identifier: http://oa.upm.es/42193/
OAI Identifier: oai:oa.upm.es:42193
DOI: 10.1016/j.egypro.2015.12.357
Official URL: https://doi.org/10.1016/j.egypro.2015.12.357
Deposited by: Memoria Investigacion
Deposited on: 27 Jun 2016 15:40
Last Modified: 15 Mar 2019 14:28
  • Logo InvestigaM (UPM)
  • Logo GEOUP4
  • Logo Open Access
  • Open Access
  • Logo Sherpa/Romeo
    Check whether the anglo-saxon journal in which you have published an article allows you to also publish it under open access.
  • Logo Dulcinea
    Check whether the spanish journal in which you have published an article allows you to also publish it under open access.
  • Logo de Recolecta
  • Logo del Observatorio I+D+i UPM
  • Logo de OpenCourseWare UPM