Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant

Chazarra Jover, Manuel Joaquín ORCID: https://orcid.org/0000-0003-2221-220X, Pérez Díaz, Juan Ignacio ORCID: https://orcid.org/0000-0003-0657-8527, García González, Javier and Helseth, Arild (2016). Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant. "Energy Procedia", v. 87 ; pp. 53-60. ISSN 1876-6102. https://doi.org/10.1016/j.egypro.2015.12.357.

Descripción

Título: Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant
Autor/es:
Tipo de Documento: Artículo
Título de Revista/Publicación: Energy Procedia
Fecha: Enero 2016
ISSN: 1876-6102
Volumen: 87
Materias:
ODS:
Palabras Clave Informales: Pumped-Storage Plant; Secondary Regulation Reserve Market; Real-Time Use of Reserves
Escuela: E.T.S.I. Caminos, Canales y Puertos (UPM)
Departamento: Ingeniería Civil: Hidráulica, Energía y Medio Ambiente
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[thumbnail of INVE_MEM_2015_226791.pdf]
Vista Previa
PDF (Portable Document Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (550kB) | Vista Previa

Resumen

This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.

Proyectos asociados

Tipo
Código
Acrónimo
Responsable
Título
Gobierno de España
ENE2012-32207
Sin especificar
Sin especificar
Explotación y Control de Centrales hidroeléctricas Reversibles

Más información

ID de Registro: 42193
Identificador DC: https://oa.upm.es/42193/
Identificador OAI: oai:oa.upm.es:42193
Identificador DOI: 10.1016/j.egypro.2015.12.357
URL Oficial: https://doi.org/10.1016/j.egypro.2015.12.357
Depositado por: Memoria Investigacion
Depositado el: 27 Jun 2016 15:40
Ultima Modificación: 15 Mar 2019 14:28