Texto completo
Vista Previa |
PDF (Portable Document Format)
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (550kB) | Vista Previa |
ORCID: https://orcid.org/0000-0003-2221-220X, Pérez Díaz, Juan Ignacio
ORCID: https://orcid.org/0000-0003-0657-8527, García González, Javier and Helseth, Arild
(2016).
Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant.
"Energy Procedia", v. 87
;
pp. 53-60.
ISSN 1876-6102.
https://doi.org/10.1016/j.egypro.2015.12.357.
| Título: | Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant |
|---|---|
| Autor/es: |
|
| Tipo de Documento: | Artículo |
| Título de Revista/Publicación: | Energy Procedia |
| Fecha: | Enero 2016 |
| ISSN: | 1876-6102 |
| Volumen: | 87 |
| Materias: | |
| ODS: | |
| Palabras Clave Informales: | Pumped-Storage Plant; Secondary Regulation Reserve Market; Real-Time Use of Reserves |
| Escuela: | E.T.S.I. Caminos, Canales y Puertos (UPM) |
| Departamento: | Ingeniería Civil: Hidráulica, Energía y Medio Ambiente |
| Licencias Creative Commons: | Reconocimiento - Sin obra derivada - No comercial |
Vista Previa |
PDF (Portable Document Format)
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (550kB) | Vista Previa |
This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.
| ID de Registro: | 42193 |
|---|---|
| Identificador DC: | https://oa.upm.es/42193/ |
| Identificador OAI: | oai:oa.upm.es:42193 |
| Identificador DOI: | 10.1016/j.egypro.2015.12.357 |
| URL Oficial: | https://doi.org/10.1016/j.egypro.2015.12.357 |
| Depositado por: | Memoria Investigacion |
| Depositado el: | 27 Jun 2016 15:40 |
| Ultima Modificación: | 15 Mar 2019 14:28 |
Publicar en el Archivo Digital desde el Portal Científico