Texto completo
Vista Previa |
PDF (Portable Document Format)
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (1MB) | Vista Previa |
ORCID: https://orcid.org/0000-0002-6884-3704, Elías, Paz, Martínez de Lucas, Guillermo
ORCID: https://orcid.org/0000-0002-3993-6223, Pérez Díaz, Juan Ignacio
ORCID: https://orcid.org/0000-0003-0657-8527, Wilhelmi Ayza, José-Román and Sánchez Fernández, José Ángel
ORCID: https://orcid.org/0000-0003-2425-5422
(2014).
Stability Analysis of a Run-of-River Diversion Hydropower Plant With Surge Tank And Spillway in the Head Pond.
"The Scientific World Journal", v. 2014
;
pp. 1-13.
ISSN 2356-6140.
https://doi.org/10.1155/2014/874060.
| Título: | Stability Analysis of a Run-of-River Diversion Hydropower Plant With Surge Tank And Spillway in the Head Pond |
|---|---|
| Autor/es: |
|
| Tipo de Documento: | Artículo |
| Título de Revista/Publicación: | The Scientific World Journal |
| Fecha: | 14 Octubre 2014 |
| ISSN: | 2356-6140 |
| Volumen: | 2014 |
| Materias: | |
| ODS: | |
| Escuela: | E.T.S.I. Caminos, Canales y Puertos (UPM) |
| Departamento: | Ingeniería Civil: Hidráulica, Energía y Medio Ambiente |
| Licencias Creative Commons: | Reconocimiento - Sin obra derivada - No comercial |
Vista Previa |
PDF (Portable Document Format)
- Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (1MB) | Vista Previa |
Run-of-river hydropower plants usually lack significant storage capacity; therefore, the more adequate control strategy would consist of keeping a constant water level at the intake pond in order to harness the maximum amount of energy from the river flow or to reduce the surface flooded in the head pond. In this paper, a standard PI control system of a run-of-river diversion hydropower plant with surge tank and a spillway in the head pond that evacuates part of the river flow plant is studied. A stability analysis based on the Routh-Hurwitz criterion is carried out and a practical criterion for tuning the gains of the PI controller is proposed. Conclusions about the head pond and surge tank areas are drawn from the stability analysis. Finally, this criterion is applied to a real hydropower plant in design state; the importance of considering the spillway dimensions and turbine characteristic curves for adequate tuning of the controller gains is highlighted
| ID de Registro: | 35662 |
|---|---|
| Identificador DC: | https://oa.upm.es/35662/ |
| Identificador OAI: | oai:oa.upm.es:35662 |
| URL Portal Científico: | https://portalcientifico.upm.es/es/ipublic/item/5623878 |
| Identificador DOI: | 10.1155/2014/874060 |
| URL Oficial: | http://www.hindawi.com/journals/tswj/2014/874060/ |
| Depositado por: | Memoria Investigacion |
| Depositado el: | 14 Jul 2015 15:15 |
| Ultima Modificación: | 12 Nov 2025 00:00 |
Publicar en el Archivo Digital desde el Portal Científico