Stability Analysis of a Run-of-River Diversion Hydropower Plant With Surge Tank And Spillway in the Head Pond

Sarasúa Moreno, José Ignacio ORCID: https://orcid.org/0000-0002-6884-3704, Elías, Paz, Martínez de Lucas, Guillermo ORCID: https://orcid.org/0000-0002-3993-6223, Pérez Díaz, Juan Ignacio ORCID: https://orcid.org/0000-0003-0657-8527, Wilhelmi Ayza, José-Román and Sánchez Fernández, José Ángel ORCID: https://orcid.org/0000-0003-2425-5422 (2014). Stability Analysis of a Run-of-River Diversion Hydropower Plant With Surge Tank And Spillway in the Head Pond. "The Scientific World Journal", v. 2014 ; pp. 1-13. ISSN 2356-6140. https://doi.org/10.1155/2014/874060.

Descripción

Título: Stability Analysis of a Run-of-River Diversion Hydropower Plant With Surge Tank And Spillway in the Head Pond
Autor/es:
Tipo de Documento: Artículo
Título de Revista/Publicación: The Scientific World Journal
Fecha: 14 Octubre 2014
ISSN: 2356-6140
Volumen: 2014
Materias:
ODS:
Escuela: E.T.S.I. Caminos, Canales y Puertos (UPM)
Departamento: Ingeniería Civil: Hidráulica, Energía y Medio Ambiente
Licencias Creative Commons: Reconocimiento - Sin obra derivada - No comercial

Texto completo

[thumbnail of INVE_MEM_2014_179911.pdf]
Vista Previa
PDF (Portable Document Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (1MB) | Vista Previa

Resumen

Run-of-river hydropower plants usually lack significant storage capacity; therefore, the more adequate control strategy would consist of keeping a constant water level at the intake pond in order to harness the maximum amount of energy from the river flow or to reduce the surface flooded in the head pond. In this paper, a standard PI control system of a run-of-river diversion hydropower plant with surge tank and a spillway in the head pond that evacuates part of the river flow plant is studied. A stability analysis based on the Routh-Hurwitz criterion is carried out and a practical criterion for tuning the gains of the PI controller is proposed. Conclusions about the head pond and surge tank areas are drawn from the stability analysis. Finally, this criterion is applied to a real hydropower plant in design state; the importance of considering the spillway dimensions and turbine characteristic curves for adequate tuning of the controller gains is highlighted

Más información

ID de Registro: 35662
Identificador DC: https://oa.upm.es/35662/
Identificador OAI: oai:oa.upm.es:35662
URL Portal Científico: https://portalcientifico.upm.es/es/ipublic/item/5623878
Identificador DOI: 10.1155/2014/874060
URL Oficial: http://www.hindawi.com/journals/tswj/2014/874060/
Depositado por: Memoria Investigacion
Depositado el: 14 Jul 2015 15:15
Ultima Modificación: 12 Nov 2025 00:00