External flooding event analysis in a PWR-W with MAAP5

Fernández Cosials, Kevin ORCID: https://orcid.org/0000-0001-6722-1084, Jiménez Varas, Gonzalo ORCID: https://orcid.org/0000-0003-2710-3029, Barreira Pereira, Pilar and Queral Salazar, José Cesar ORCID: https://orcid.org/0000-0001-9384-2474 (2014). External flooding event analysis in a PWR-W with MAAP5. "Annals of Nuclear Energy", v. 76 ; pp. 226-236. ISSN 1873-2100. https://doi.org/10.1016/j.anucene.2014.09.055.

Descripción

Título: External flooding event analysis in a PWR-W with MAAP5
Autor/es:
Tipo de Documento: Artículo
Título de Revista/Publicación: Annals of Nuclear Energy
Fecha: 17 Octubre 2014
ISSN: 1873-2100
Volumen: 76
Materias:
ODS:
Escuela: E.T.S.I. Industriales (UPM)
Departamento: Energía y Combustibles
Licencias Creative Commons: Ninguna

Texto completo

[thumbnail of paper-v7.pdf] PDF (Portable Document Format) - Se necesita un visor de ficheros PDF, como GSview, Xpdf o Adobe Acrobat Reader
Descargar (2MB)

Resumen

The Fukushima accident has drawn attention even more to the importance of external events and loss of energy supply on safety analysis. Since 2011, several Station Blackout (SBO) analyses have been done for all type of reactors. The most post-Fukushima studies analyze a pure and straight SBO transient, but the Fukushima accident was more complex than a standard SBO. At Fukushima accident, the SBO was a consequence of an external flooding from the tsunami and occurred 40 min after an emergency shutdown (SCRAM) caused by the earthquake. The first objective of this paper is to assume the consequences of an external flooding accident in a PWR site caused by a river flood, a dam break or a tsunami, where all the plant is damaged, not only the diesel generators. The second objective is to analyze possible actions to be performed in the time between the earthquake event (that causes a SCRAM) and the external flooding arrival, which could be applicable to accidents such as dam failures or river flooding in order to avoid more severe consequences, delay the core damage and improve the accident management. The results reveal how the actuation of the different systems and equipments affect the core damage time and how some actions could delay the core damage time enough to increase the possibility of AC power recovery

Más información

ID de Registro: 78286
Identificador DC: https://oa.upm.es/78286/
Identificador OAI: oai:oa.upm.es:78286
URL Portal Científico: https://portalcientifico.upm.es/es/ipublic/item/5491376
Identificador DOI: 10.1016/j.anucene.2014.09.055
URL Oficial: https://www.sciencedirect.com/science/article/pii/...
Depositado por: Dr. Kevin Fernandez-Cosials
Depositado el: 03 Feb 2024 14:15
Ultima Modificación: 12 Nov 2025 00:00